Client
Ireland Department for Regional Development and DOE Roads Service
Our contribution
- Landscape Design Proposals
- Site supervision during construction
- Water quality monitoring
- Design and monitoring of ecological protection measures including
a sustainable drainage system
- Liaison with Engineers and Contractors and statutory authorities to deliver requirements of the Environmental statement
- Environmental Management Plan
|
 |
These measures have been integrated into the landscape design and aim to protect the Lower River Bann and Lough Neagh RAMSAR and ASSI ecological interests. Prior to completion of the design we co-ordinated ecological surveys for protected species: badgers, bats, invertebrates, otters and local and migratory birds and subsequently prepared an environmental management plan to ensure protection of the natural environment during construction. Essential protection measures such as badger fencing and tunnels were incorporated into the landscape design. We have also carried out water quality monitoring throughout the construction phases.
Important features of the design of the road included the development of a sustainable urban drainage system for run-off from the road into a series of swales and ditches planted with local provenance wetland grass species; a single span bridge to minimise disturbance to the riverbed and the use of local provenance plant material specially contract grown from seeds collected within a 10km radius from the site.